Keywords: GDOT is planning to construct a new interchange at the intersection of S.R. 316/U.S. 29 and S.R. 81. The proposed interchange would feature a tight urban diamond interchange design. The new bridge over S.R. 316/U.S. 29 would also accommodate a future widening of S.R 316 from four to six lanes, plus a grade barrier separated HOV lane. Work on the interchange will begin 2019. GDOT is planning to construct a new interchange at the intersection of S.R. 316/U.S. 29 and S.R. 81. The proposed interchange would feature a tight urban diamond interchange design. The new bridge over S.R. 316/U.S. 29 would also accommodate a future widening of S.R 316 from four to six lanes, plus a grade barrier separated HOV lane. Work on the interchange will begin 2019. |