Keywords: i-69 i69 interstate 69 interstate69 indiana monroe county monroecounty interstate road freeway construction infrastructure i-69 development partners i69developmentpartners isolux corsán usa isoluxcorsánusa Indiana I-69 Corridor Project; Section 5; Fullerton Road work zone, Monroe County Looking north from the Rockport Road overpass toward the under construction Fullerton Road overpass and interchange in Monroe County, Indiana. From near this location northward, State Road 37 (future Interstate 69) will have three lanes in each direction for a total distance of about 11 1/2 miles. The additional lanes are being carved from the roadway median with a concrete barrier wall (pictured) to safely separate traffic. Between the SR 37/SR 46 interchange and the future Sample Road interchange, a cable barrier will be installed. I-69 Development Partners, concessionaire; Isolux Corsán USA, prime contractor. Indiana I-69 Corridor Project; Section 5; Fullerton Road work zone, Monroe County Looking north from the Rockport Road overpass toward the under construction Fullerton Road overpass and interchange in Monroe County, Indiana. From near this location northward, State Road 37 (future Interstate 69) will have three lanes in each direction for a total distance of about 11 1/2 miles. The additional lanes are being carved from the roadway median with a concrete barrier wall (pictured) to safely separate traffic. Between the SR 37/SR 46 interchange and the future Sample Road interchange, a cable barrier will be installed. I-69 Development Partners, concessionaire; Isolux Corsán USA, prime contractor. |